Логотип Севмаша

29 Dec, memorries of this day.

December 29, 1993

Built at PO «North Machine-Building Enterprise» the fifth NPS of project no. 971 (plant no.833, board no. K-154, since 21.07.1991 – «Tigr») was brought in the system of Navy fleet

December 29, 1991

Built at PO «North Machine-Building Enterprise» the third NPS of project no. 971 (plant no.831, board no. K-461, since 26.07.1991 – «Volk») was brought in the system of Navy fleet.

December 29, 1989

Built at PO «North Machine-Building Enterprise» the fourth NPS of project no. 949A (plant no.636, board no. K-119, since 06.04.1993 – «Voronezh») was brought in the system of Navy fleet

December 29, 1988

Built at PO «North Machine-Building Enterprise» the prototype (for the plant) NPS of project no. 971 (plant no.821, board no. K-480, since 10.10.1990 – «Bars») was brought in the system of Navy fleet.In whole, at PO «North Machine-Building Enterprise» 7 NPS of this project were built

December 29, 1981

Built at «North Machine-Building Enterprise» the prototype NPS of the third generation of project no. 941 of class «Tayfun» (plant no.711, board no. TK-208) is the largest submarine in the world (was included in the Hinesses Book of records)

December 29, 1974

At «North Machine-Building Enterprise» the last – tenth NPS of project no. 667B (plant no.340, board no. K-171) was given to Navy fleet

December 29, 1973

At «North Machine-Building Enterprise» the third NPS of project no. 667B (plant no.312, board no. K-450) was given to Navy fleet

All dates

Сайт рзработан PAPAFERD